Building Inspection Policy

Policy

  • The service inspection certification form will be required prior to the plumbing rough.
  • Prior to the foundation inspection a form board survey will be required with finish floor elevation.
  • The general contractor will be responsible for requesting all inspections.
  • Backflow certification is required on all irrigation systems and fire sprinkler systems.